Level Extreme platform
Subscription
Corporate profile
Products & Services
Support
Legal
Français
Using existing program?
Message
 
To
26/03/2007 13:34:35
General information
Forum:
Visual FoxPro
Category:
Coding, syntax & commands
Miscellaneous
Thread ID:
01207621
Message ID:
01208558
Views:
31
>After Bill of Material (BOM) Explosion on each Parent Assembly number with multiple level, all the parts that included in the BOM will be saved in Excel file. Each part will be multiplied by the assembly demand. For instance, Assy 1000001 has a component part that requires 3 per build and the order for this assy is 5; then quantity required will be 3x5=15. This will show up in the qtyrequired column in order to build 10 assy 1000001. Am I clear on my explanation? Sorry, if its a bit confusing. Thanks, Sam


As I said, can you post some simple data from all tables and desired result from that data?
Against Stupidity the Gods themselves Contend in Vain - Johann Christoph Friedrich von Schiller
The only thing normal about database guys is their tables.
Previous
Next
Reply
Map
View

Click here to load this message in the networking platform