I have created an Integration Services Project. It's been a while since the last time I had to deal with that. There is something I cannot remember how to do. In the package, in the Data Flow window, I have drop an OLE DB for the source and another one for the destination. I have defined the one for the source. But, for the destination one, there is something I am trying to do. I have created an empty database on SQL Server. There is no table in it. But, when I have to define the data flow for the destination, I have to select a table. But, if I recall correctly, I didn't have to do that when I did it about 18 months ago. Everytime I was running the package, I was removing all tables from the SQL Server database. So, the only thing remaining for the database itself. I also didn't have to define everything for all tables of my VFP directory in the package. I did something that was doing it by itself. So, I have about 120 tables. What is the simplest way to create a data flow object for each 120 tables as the source linked to their related 120 data flow objects of the destination?