>Hi. I am interested in designing a delivery system in VFP7. The system would be small - 4 trucks and 6 deliveries per truck/day (furniture).. What i the feasabilty of a system with each truck being represented on the form and drag and drop (deliveries) among the trucks?
>
>Thanks. Randy
I had to do this back in 95 VFP 3 for a furniture company. It can be done. The drag/drop had to be simulated back then (don't think that became a feature until version 6) but it worked. No reason why it couldn't be done in VFP7 :) Any reason why you can't use VFP9?
If I recall correctly Jim Booth had an article on using ole drag drop instead of the native drag drop features. Not sure if that is any better in comparison to the drag drop of version 7 sp1 or not.
.·*´¨)
.·`TCH
(..·*
010000110101001101101000011000010111001001110000010011110111001001000010011101010111001101110100
"When the debate is lost, slander becomes the tool of the loser." - Socrates
Vita contingit, Vive cum eo. (Life Happens, Live With it.)
"Life is not measured by the number of breaths we take, but by the moments that take our breath away." -- author unknown
"De omnibus dubitandum"