>Say we were working with a FREE table and wanted to have a calculated field where Field4 = Field1+Field2+Field3. I could do this with a form method triggered by the lost focus event for Fields 1-3, but is that the best way? Is there another way that would be more reliable similar to a stored procedure in a database table?
>
>Thanks
I think valid or lost focus is the best way in this situation.
If it's not broken, fix it until it is.
My Blog