Level Extreme platform
Subscription
Corporate profile
Products & Services
Support
Legal
Français
Slowing down a progress bar
Message
General information
Forum:
Visual FoxPro
Category:
Other
Title:
Slowing down a progress bar
Miscellaneous
Thread ID:
00355706
Message ID:
00355706
Views:
57
Hi:

As I'm scanning tables I'm showing the progress using the progress bar control. I would like to slow the process down slightly so I inserted an INKEY(.05) inside each scan loop. The problem is that I can't tell the difference between INKEY(.05) and INKEY(.0005). I would like to be able to adjust the speed with greater control. Is there a better way to do this?

Thanx,
Charlie
Next
Reply
Map
View

Click here to load this message in the networking platform