> Since the project is a table, you could copy it to another table before compiling. Afterwards, you can open the project as a table, and compare the
> timestamps between the project and the copy. Look at the timestamps and, if they've changed, it means that that the file was recompiled. In the case of
> VCXs the TYPE column equals "V".
> George
I did it in this way and I found out: timestamp of vcx (TYPE='V') records in pjx table was changed. I haven't checked 'Recompile all file' option. I didn't any changes to the source code before compilation. The other records of pjx table contained identical timestamp like table of pjx before compilation.
Compilation without 'Recompile all files' recompiles vcx libraries even if any the change was done in the source code.
I don't know to find a cause of this behaviour.
jano
Jan