Hi!
I prefere to use NULL too. When talk about VFP, I set up NullDisplay property of control to '//' that will display NULL date as pretty empty date ;)
>I second that.
>
>>Terry,
>>
>>I prefer to use NULL for an empty date. But, to each his own.
>>
>>>Okay, I'll use that date as my empty then.
>>>
>>>Thanks again.
>>>Terry
>>>
>>>>No there isn't. If you insert empty date from QA it gets converted to 01/01/1900.
>>>>
>>>>>So as to not have a null date field, is there an empty date value like '' for string or 0 for numeric or decimal that can be used as a default value for a field?
>>>>>
>>>>>Something better than using an old date like 1/1/1800?
>>>>>
>>>>>Thanks
>>>>>Terry
Vlad Grynchyshyn, Project Manager, MCP
vgryn@yahoo.comICQ #10709245
The professional level of programmer could be determined by level of stupidity of his/her bugs
It is not appropriate to say that question is "foolish". There could be only foolish answers. Everybody passed period of time when knows nothing about something.