Hi Kjell,
If you're lucky your application could be compiled and run in VFP 7 w/o any modification. However, before you deside to go forward with upgrade take a close look at 'Behavior Changes since the Previous Version' in the VFP 7 help and Readme file on the VFP installation CD.
>Hallo everybody
>I am right now sitting with the VFP7 package in my hand.
>But I have a question before I upgrade VFP6.
>Can I compilate my VFP6 projects without ANY modification of the code and run the VFP7 apps direct.
>I ask because when I upgraded from VFP2.6 to VFP6 (it was a big step) I had to spend weeks with the code, before it worked 100% in VFP6.
>I want to upgrade, but I have not any time to modificate the old code to suit VFP7.
>If I must, I have to stay with VFP6 :-(
>
>Thanks in advace
>/Kjell
--sb--