>I have a report with several columns of numeric data and the last few colums I want to calculate sum and percentage results. However I have reached the limitation of how much text I can enter in the "Expression for Field on Report" using the expression builder.
>Is there a way to be able to enter more text so I can include all the fields that I need?
>
>Thank you
>Max
Max,
You can use a UDF. In the expression put myCalculation(). Inside of the function (in a .prg file), the fields will be available to do your calculation.
Steve Gibson