>I need to write a scheduling system in VFP 7.0.
>
>The purpose of this scheduler is to schedule production runs on machines.
>It should be fairly simple in design. Any job number (coming from a work order table) not yet scheduled can be appended to the end of scheduler (list type) OR be insterted between other jobs also.
>
>All jobs should be allowed to be moved around at any time. The visual order of the jobs is the actual order the jobs should be done. There are approx. 100 jobs (maximum) that can be scheduled. Also I need to select the type of run of the job, "Regular", "Combo", or "Split" preferably from a drop list selection. I also need to add comments, trigger events and perform validations, etc. for every job/line added.
>
>Does anyone have any recommendations on what I should use to do this?
>Will a list box interface be adequate for this design?
>
>Thanks to everyone for thier advice.
>
>John
Consider a Table that can be easily altered containing vital info for Task processing
Edgar L. Bolton, B.S. B.B.A.