>I've understood the revision to be equal to the number of seconds since midnight, January 1, 2000, local time, divided by 2
Thanks for replying. I have tried this formula and it doesn't work. The number of days since January 1st, 2000 is only used for the build number.
Have a look at any of your previously built assembly.
>Hi Eric,
>
>I've understood the revision to be equal to the number of seconds since midnight, January 1, 2000, local time, divided by 2
>
>>In the AssemblyInfo.VB, say you give the following attribute for the version:
>>
Assembly: AssemblyVersion("1.0.*")
>>
>>The version is made of 4 parts (Major.Minor.Build.Revision).
>>
>>The Build number is given the number of days since January 1st, 2000.
>>
>>What is the meaning of the revision number? I saw in a book that it is the number of elapsed seconds in the current days since midnight / 2 but the formula is not working. Any ideas?
Éric Moreau, MCPD, Visual Developer - Visual Basic MVP
Conseiller Principal / Senior Consultant
Moer inc.
http://www.emoreau.com