Gravity Probe B
Message
General information
Forum:
Politics
Category:
Other
Title:
Gravity Probe B
Miscellaneous
Thread ID:
00995154
Message ID:
00995154
Views:
22
Hi,

Here is the Gravity Probe B Mission update. The project suffered a rough time this past week.

#-----------------------------------------------------

==============================================
GRAVITY PROBE B MISSION UPDATE FOR 11 MARCH 2005
==============================================

GP-B STATUS AT A GLANCE
====================
Mission Elapsed Time: 325 days (46 weeks/10.75 months)
Science Data Collection: 196 days (28 weeks/6.50 months)
Current Orbit #: 4,796 as of 2:00PM PST
Spacecraft General Health: Good
Roll Rate: Normal at 0.7742 rpm (77.5 seconds per revolution)
Gyro Suspension System (GSS): All 4 gyros digitally suspended in science mode
Dewar Temperature: 1.83 kelvin, decreasing slowly
Global Positioning System (GPS) lock: Greater than 98.4%
Attitude & Translation Control (ATC): X-axis attitude error: 351.8 marcs rms as of 3/10/05
Y-axis attitude error: 355.4 marcs rms as of 3/10/05
Command & Data Handling (CDH): Now using B-side (backup) computer & guidance systems
Multi-bit errors (MBE): 0
Single-bit errors (SBE): 7 (daily avg.)
Telescope Readout (TRE): Nominal
SQUID Readouts (SRE): Nominal
Gyro #1 rotor potential: -0.7 mV as of 3/10/05
Gyro #2 rotor potential: +8.3 mV as of 3/10/05
Gyro #4 rotor potential: -6.0 mV as of 3/10/05
Gyro #3 Drag-free Status: Backup Drag-free mode (normal)

MISSION DIRECTOR'S SUMMARY
========================
On mission day #325, the GP-B spacecraft is in good health, but it is now running on its B-side, or back-up computer and guidance systems, including the main on-board computer, control gyros, attitude control electronics, and thruster coils.

The switch-over to the backup systems occurred automatically at 7:17 am PST last Friday morning, 4 March 2005, due to two or more multi-bit errors (MBE's) in the flight computer, occurring within a 0.2 second interval. The MBEs were caused by radiation hits in the south magnetic pole. This event triggered pre-programmed safemodes, which in turn resulted in the automatic switch-over. We have provided a more complete description of this anomalous event and the ensuing recovery efforts in the Mission News Section below.

The possibility of a B-side switch during the science phase of the mission was anticipated, and the team had recently rehearsed the procedures for dealing with such an event. As a result, much of the recovery process--which otherwise might have taken two weeks or longer--was accomplished last weekend. This event has caused us to lose about a week's worth of science data. Our data collection rate has been running above 99% up to this point in the science phase of the mission, and the loss of a week's data will only reduce that level by about 2%, which is still well within the mission requirement of 90%. Assuming that this event did not place any non-relativistic torques (forces) on the gyros, the loss of this small amount of data will not have any significant effect on the outcome of the experiment. Analysis to ensure that this is the case is underway.

This week, the team is still in the process of fine-tuning the backup control systems in order to provide the same level of response and quality of science data that we had been obtaining from the main (A-side) systems prior to this event. These fine-tuning efforts are proceeding well, and we have already resumed science data collection.

GP-B MISSION NEWS--GP-B SPACECRAFT NOW RUNNING ON B-SIDE (BACKUP) COMPUTER & GUIDANCE SYSTEMS
===============================================================================
As a reminder, just under two weeks after GP-B's spectacular launch on 20 April 2004, the spacecraft was hit by radiation while passing over the Earth's south magnetic pole. This radiation caused data errors in the spacecraft's primary (A-side) computer, which exceeded its capacity for self-correction. This event triggered a number of safemodes, and by design, the spacecraft automatically switched over to the backup (B-side) computer and put the planned timeline of events on hold.

The automatic switch over from primary to backup computer worked flawlessly. Since this event occurred in the very early stages of initialization and checkout of all the spacecraft systems and instrumentation, the mission operations team, over the course of a week, sent a series of commands to the spacecraft that re-booted the primary computer, restored its data parameters, and then switched control of the spacecraft back to the main computer.

After this early safemode event occurred, the team recognized that, although unlikely, such an event could happen during the science phase of the mission, interrupting the collection of science data. To prepare for such a possibility, the team created a set of recovery procedures, designed to minimize data loss should such an event recur. A few weeks ago, the GP-B mission operations team conducted a complete rehearsal of these recovery procedures-not unlike an emergency preparedness drill-to ensure that the team was ready to handle the recurrence of a so-called "B-side switch."

As it turns out, the timing for this rehearsal couldn't have been better. At 7:17 AM PST last Friday, 4 March 2005, automated safemodes were activated, causing an autonomous switch to B-side hardware and to "gyro hold" for attitude control. This event was declared a "major" anomaly. The cause of the safemode activation was a memory checkout detection of at least two multi-bit errors (MBE's) in the flight computer occurring within a 0.2 second interval.

The safemode responses proceeded as designed, and the vehicle remained safe during the autonomous switch to the B-side control and guidance hardware. Not all of the systems on board the spacecraft switched to the B-side. For example, the payload systems--Gyro Suspension System (GSS), SQUID Readouts (SRE), Experimental Control Unit (ECU), Telescope Readout (TRE), and Dewar--remained on the primary or A-side. The science gyro data indicated that the vehicle remained pointed to the guide star within 500 arcseconds, with a coning of 50 arcseconds. This is consistent with the "gyro hold" state, which minimizes the impact to science data collection.

Being fully rehearsed, the team followed the recovery procedures to re-configure the spacecraft for collecting science data using the B-side computer and control systems and to return as quickly as possible to collecting science data. In order to obtain additional NASA/TDRSS relay satellite communications passes that would assist in the recovery, a spacecraft emergency was declared with NASA's Goddard Space Flight Center (GSFC) last Friday.

After the anomaly occurred, as anticipated, the vehicle roll rate decreased from the nominal 0.7742 rpm. As part of the recovery procedure the roll-down was stopped at 0.67 rpm and was subsequently commanded to roll back up. This roll-up took about 6 hours and returned to the nominal 0.7742 rpm at 11:00 PM PST last Friday. By Saturday morning (less than 27 hours after the B-side switch), we returned to drag-free operation. Much of this work involved transferring files and software piece-by-piece from the A-side to the B-side computers-much like the process of migrating all your files and programs when upgrading your home computer.

During the recovery sequence, when we rebooted the SRE to resynchronize the spacecraft's clocks, one of the command blocks for restarting drag-free operations was inadvertently omitted. This omission was discovered during a subsequent routine system checkout, and drag-free operation was once again restored on Tuesday. Also, the SRE reboot sequence momentarily changed the gyro suspension system (GSS) to analog mode, and it corrected the existing MBE's in the SRE. The B-side GPS receiver was started for the first time on-orbit and acquired the GPS constellation within 30 minutes.

On Sunday morning, we adjusted various parameters to improve A-side star tracker performance. We also adjusted the control gyros (navigational gyros used to maintain the spacecraft's pointing direction when the telescope is not locked onto the guide star), and by early Sunday evening, we successfully locked onto the guide star. Then, on the next telemetry pass, the telescope achieved a clean guide star acquisition! The attitude control team is continuing to make adjustments to improve the pointing accuracy of the spacecraft under B-side control.

The Stanford/Lockheed Martin/NASA Gravity Probe B team responded to this event in a highly professional manner. The team continuously demonstrated extraordinary dedication and expertise, and they remained focused on achieving flawless execution. Thanks to a robust design and an outstanding operations team, Gravity Probe B is again collecting valuable science data to test Einstein's theory.

===================
PREVIOUS GP-B UPDATES
===================
If you wish to read any of our previous updates, our GP-B Web site includes a chronological archive of all the updates/highlights (with photos and drawings) that we have posted over the past 8 years: http://einstein.stanford.edu/highlights/hlindexmain.html

=============================
OTHER LINKS THAT MAY INTEREST YOU
=============================

Our GP-B Web site, http://einstein.stanford.edu contains lots of information about the Gravity Probe B experiment, general relativity, and the amazing technologies that were developed to carry out this experiment.

Visual tour of the GP-B spacecraft and payload from our GP-B Web site: http://einstein.stanford.edu/content/vehicle_tour/index.html

PDF file containing a 1/20 scale, paper model of the GP-B spacecraft that you can download print out, and assemble: http://einstein.stanford.edu/content/paper_model.

NASA's Marshall Space Flight Center also has a series of Web pages devoted to GP-B: (http://www.gravityprobeb.com )

Photo, taken through a telescope by Swiss physics teacher and amateur astronomer Stefano Sposetti, of GP-B spacecraft in orbit, passing near IM Pegasi: http://aida.astronomie.info/sposetti.


The Harvard-Smithsonian Center for Astrophysics (Cambridge) and York University (Toronto), with contributions from the Observatoire de Paris, have been studying the motions of the guide star, IM Pegasi for over a decade. To find out more, visit: http://www.yorku.ca/bartel/guidestar/

In addition, you'll find information in the Guide Star FAQ on our Web site: http://einstein.stanford.edu/content/faqs/faqs.html#guidestar and on pages 18-20 of the Gravity Probe B Launch Companion: http://einstein.stanford.edu/highlights/GP-B_Launch_Companion.pdf.

Track the GP-B satellite on the Web using NASA's Java-based J-Pass satellite tracking application at: http://science.nasa.gov/realtime/JPass/ Also, you can track the GP-B satellite on Personal Digital Assistants (PDAs) using either the Palm OS or Pocket PC operating systems with software from Big Fat Tail Productions: http://www.bigfattail.com.

The Einstein Exhibition at the Skirball Cultural Center in Los Angeles through May 2005: Information about the Einstein exhibition is available on the Skirball Center Web site: http://www.skirball.org/index.asp?s=exhibit&p=einstein.asp. If you can't make it to Los Angeles, you can visit the AMNH's virtual Einstein exhibit on the Web at: http://www.skirball.org/exhibit/amnh_frame.html.

==========================
ABOUT THE GPB-UPDATE EMAIL LIST
==========================
The email distribution list for this GP-B Weekly Highlights update is maintained on the Stanford University email lists server.

To subscribe to this list, send an email message to "majordomo@lists.Stanford.edu" with the command "subscribe gpb-update" in the body of the message (not in the Subject line).

You can unsubscribe at any time by sending an email message to "majordomo@lists.Stanford.edu" with the command, "unsubscribe gpb-update" in the body of the message (not in the Subject line.)

--
**********************************
NASA - Stanford - Lockheed Martin
Gravity Probe B Program
"Testing Einstein's Universe"
http://einstein.stanford.edu

Bob Kahn
Public Affairs Coordinator

Phone: 650-723-2540
Fax: 650-723-3494
Email: kahn@relgyro.stanford.edu
**********************************

#-------------------------------------------

Regards,

LelandJ
Leland F. Jackson, CPA
Software - Master (TM)
smvfp@mail.smvfp.com
Software Master TM
Reply
Map
View

Click here to load this message in the networking platform