Plateforme Level Extreme
Abonnement
Profil corporatif
Produits & Services
Support
Légal
English
Manufacturing : Work flow logistics
Message
De
29/11/2002 16:38:56
John Vlahos
V I Software Solutions Design
Mississauga, Ontario, Canada
 
 
À
29/11/2002 16:13:23
Gerry Schmitz
GHS Automation Inc.
Calgary, Alberta, Canada
Information générale
Forum:
Visual FoxPro
Catégorie:
Autre
Divers
Thread ID:
00728246
Message ID:
00728258
Vues:
20
The client doesn't want to spend more than they have already. :0) That is a constraint as much as the others.

I would like an "easy" method for the "production operator" to create each roll line (in my grid), so that the "weighing operator" doesn't have to create this entry as he/he is weighing each roll. The weigher would be aware of the "incoming" produced item before they arrive in his section, and would only be responsible for weighinng.

I wouldn't like to take the pressure off the production operators and throw it on a couple of weighing operators.

Do you think it is reasonable to create the "package" you mentioned as an alternative, and along with the package, create all the roll records when preparing this package, or am I asking for trouble? In other words, as with the pevious example, asn order of 100 rolls, would automaticaly append 100 items in my production file for that particular job, before the rolls get produced, waiting foe the qc updates?
Précédent
Suivant
Répondre
Fil
Voir

Click here to load this message in the networking platform