Hi Cetin,
Glenn's Original Message#
797684 of this thread:
"I needed a solution to determine the number of workdays between two dates and have not been satisfied with the prevalent techniques. The ONLY reliable method required looping, and if the dates were very far apart it would have an impact on performance, There were several calculation methods sugested but when pressed all were found to produce errors."
Fabio